Mount
Sinai Hospital, New York, New York
Research Laboratory Computer Facility
Subconsultant to Lan Associates |
|
Relocation
of laboratory animal facilities and an ultra-centrifuge
facility were required in order to install
a computer within the research laboratory
complex.
Chu & Gassman provided the electrical, HVAC
and plumbing design for both the relocation
of existing laboratory facilities and the
installation of the new computer system. A
roof top cooling tower installation represented
a challenge which was solved after an extensive
review of the existing laboratory complex.
|
|
| Personnel |
Client
Contact |
|
William
Gassman
R. Keith Craven
Dave Bhatia |
|
| Cost |
|
| $350,000 |
|
| Completed
|
|
| 1987 |
|
Mr.
Guy Van Doren, Vice President
Lan Associates
662 Goffle Road
Hawthorne, NJ 07506
(201) 423-0350 |
|
| |
| |
|
Computer
Facility
Methodist Hospital
Brooklyn, New York
Subconsultant to Lan Associates |
|
Installation
of the hospital's billing system computer
within an existing nursing school annex required
extensive revisions to the entire floor. Chu
& Gassman arranged for and coordinated additional
electrical power requirements with Con Edison
Co.
Extensive fire protection and security systems
were provided to preclude damage to the extensive
computer installation and prevent unauthorized
personnel entrance to the computer facility.
|
|
| Personnel |
Client
Contact |
|
William
Gassman
R. Keith Craven
Dave Bhatia |
|
| Cost |
|
| $350,000 |
|
| Completed
|
|
| 1985 |
|
Mr.
Guy Van Doren, Vice President
Lan Associates
662 Goffle Road
Hawthorne, NJ 07506
(201) 423-0350 |
|
| |
| |
|
Paramount
Pictures
One Gulf & Western Plaza, New York, New York
Large Computer System Installation
Subconsultant to Lan Associates |
|
| Chu
& Gassman provided electrical and HVAC design
associated with the installation of a large
computer system; facility encompassed the
entire floor of the Gulf & Western Building,
Columbus Circle, New York. The electrical
design required coordination with Con Edison
to arrange for the increased electrical power
requirements of the computer equipment. The
positioning of the facility on the 20th floor
required extensive remodeling of utility chases
to both the basement electrical rooms and
the roof top cooling towers. |
|
| Personnel |
Client
Contact |
|
William
Gassman
R. Keith Craven
Dave Bhatia |
|
| Cost |
|
| $1.2
Million |
|
| Completed
|
|
| 1985 |
|
Mr.
Guy Van Doren, Vice President
Lan Associates
662 Goffle Road
Hawthorne, NJ 07506
(201) 423-0350 |
|
|
|
|
|