Bernard
Fineson Development Center
Hillside Unit, Queens Village, New York
FDC #3872 - Replacement: Primary Electric
Feeder |
|
| Scope
of Project: New electric power feeders were
provided to six (6) buildings and existing
service connection equipment was upgraded.
New metering and connections were provided
in the existing powerhouse 5 kV switchgear.
In addition to design, Chu & Gassman provided
construction observation for this project. |
|
| Personnel |
Client
Contact |
|
|
William
Gassman
R. Keith Craven
Raghbir S. Bisal
|
|
| Cost |
|
| $350,000
|
|
| Completed
|
|
| 1990 |
|
Mr.
Fawzi Almahdi, Project Manager
Dormitory Authority State of New York
One Penn Plaza, 52nd Floor
New York, New York 10119
(718) 979-2058 |
|
| |
| |
|
Community
Residence Expansion
Hostel No. 7215
208 Old South Path Road
Melville, NY 11747
FDC Project 5096 |
|
| Chu
& Gassman provided the electrical, fire/smoke
detection, HVAC and plumbing design associated
with the modernization and expansion of the
Office of Mental Retardation & Development
Disabilities. New fire alarm and sprinkler
systems were provided. |
|
| Personnel |
Client
Contact |
|
|
Jon
T. Chu
Stanley Chan
Raghbir S. Bisal
Frank Raphaelian
|
|
| Cost |
|
| $350,000
|
|
| Completed
|
|
| 1991 |
|
Mr.
Fawzi Almahdi, Project Manager
Dormitory Authority State of New York
One Penn Plaza, 52nd Floor
New York, New York 10119
(718) 979-2058 |
|
| |
| |
|
Kings
Park Psychiatric Center
Kings Park, Long Island, New York |
|
Project
4760 - Alterations/Improvements to Kitchen
Chu & Gassman provided the design and construction
observation for the installation of three
new walk-in freezers and one refrigerator
in the kitchen area. Project included modifications
to existing pantries and food preparation
areas, new kitchen walls and floors together
with new lighting. Project phasing design
was provided to prevent interruption to existing
kitchen operation.
Project 4289 - Modular Office Buildings Chu
& Gassman provided the design for modular
offices and an office addition to the Center=s
Engineering Department at Building #5. New
electric service was provided. Coordination
with Suffolk County Department of Health was
required to complete the design of the wastewater
treatment system for this project. |
|
| Personnel |
Client
Contact |
|
|
William
Gassman
Juris F. Millers
Frank Raphaelian
Larry Morton
|
|
| Cost |
|
$325,000
(Project 4760)
$730,000 (Project 4289) |
|
| Completed
|
|
| 1990 |
|
Mr.
Fawzi Almahdi, Project Manager
Dormitory Authority State of New York
One Penn Plaza, 52nd Floor
New York, New York 10119
(718) 979-2058 |
|
| |
| |
|
OMRDD
Community Residence
Hostel #2329, 1025 East 167th Street, Bronx,
NY
FDC #4695/#6702 |
|
| Chu
& Gassman provided design services for sewer
connection between a new FDC residence and
NYC DEP sewers. A major 20" diameter water
main was encountered which necessitated extensive
coordination with various NYC agencies including
NYC DEP, Con Edison, NY Telephone and NYC
Water Department. |
|
| Personnel |
Client
Contact |
|
|
Jon
T. Chu
|
|
| Cost |
|
| $200,000 |
|
| Completed
|
|
| 1992 |
|
Mr.
Fawzi Almahdi, Project Manager
Dormitory Authority State of New York
One Penn Plaza, 52nd Floor
New York, New York 10119
(718) 979-2058 |
|
| |
| |
|
MANHATTAN
PSYCHIATRIC CHILDREN'S CENTER
FDC #4803
New 12" Diameter Water Line |
|
| Chu
& Gassman provided the design and construction
observation for the installation of a new
12" diameter water line. Connection to existing
water lines required the utilization of taps
utilizing insertion valves. |
|
| Personnel |
Client
Contact |
|
|
Jon
T. Chu
T. Lin
|
|
| Cost |
|
| $25,000 |
|
| Completed
|
|
| 1990 |
|
Mr.
Fawzi Almahdi, Project Manager
Dormitory Authority State of New York
One Penn Plaza, 52nd Floor
New York, New York 10119
(718) 979-2058 |
|
| |
| |
|
MANHATTAN
PSYCHIATRIC CHILDREN'S CENTER
FDC #4763
Site Security Lighting System |
|
| Scope
of Project: New high-pressure sodium lighting
and an extensive security fence around the
perimeter of the Center's property. |
|
| Personnel |
Client
Contact |
|
|
William
Gassman
Larry
Morton
|
|
| Cost |
|
| $250,000 |
|
| Completed
|
|
| 1991 |
|
Mr.
Fawzi Almahdi, Project Manager
Dormitory Authority State of New York
One Penn Plaza, 52nd Floor
New York, New York 10119
(718) 979-2058 |
|
| |
| |
|
MANHATTAN
PSYCHIATRIC CHILDREN'S CENTER
FDC #4847
Study of Existing Fire Hose Connections |
|
| Provided
investigation and testing to insure that all
ward hose connections were compatible with
the New York City Fire Department's fire connections;
and, prepared a report indicating the findings
of the investigation. |
|
| Personnel |
Client
Contact |
|
|
Jon
T. Chu
Larry Morton
|
|
| Completed
|
|
| 1991 |
|
Mr.
Fawzi Almahdi, Project Manager
Dormitory Authority State of New York
One Penn Plaza, 52nd Floor
New York, New York 10119
(718) 979-2058 |
|
| |
| |
|
MANHATTAN
PSYCHIATRIC CHILDREN'S CENTER
Upgrading Heating System in Kitchen/Tray Area |
|
| A
study of the existing kitchen ventilation
system and an extensive investigation of the
heating system's distribution piping in Building
106 was made prior to preparing preliminary
design for the rehabilitation of the heating
system. Also, an extensive investigation of
the Center's entire heating system's distribution
piping was made. |
|
| Personnel |
Client
Contact |
|
|
Jon
T. Chu
Boris
Rakita
|
|
| Cost |
|
| $250,000 |
|
| Completed
|
|
| 1991 |
|
Mr.
Fawzi Almahdi, Project Manager
Dormitory Authority State of New York
One Penn Plaza, 52nd Floor
New York, New York 10119
(718) 979-2058 |
|
| |
| |
|
MANHATTAN
PSYCHIATRIC CENTER
FDC #4596
TV Camera Security System |
|
| Chu
& Gassman provided design and construction
observation services for installation of new
TV surveillance cameras, monitors, recording
equipment and controls to monitor Buildings
103 (kitchen area) and Building 106. Scope
of project: door and window repair and rehabilitation,
new security gates and fences, main monitoring
console at the existing and operational security
office. |
|
| Personnel |
Client
Contact |
|
|
William
Gassman
Larry Morton
|
|
| Cost |
|
| $250,000 |
|
| Completed
|
|
| 1991 |
|
Mr.
Fawzi Almahdi, Project Manager
Dormitory Authority State of New York
One Penn Plaza, 52nd Floor
New York, New York 10119
(718) 979-2058 |
|
| |
| |
|
MANHATTAN
PSYCHIATRIC CENTER
FDC #4428
Study of Wastewater Discharge from Harlem
River |
|
| In
1992, we made field surveys including dye
tests at the Center's seven major buildings.
Our report indicated remedial measures to
be undertaken to prevent further escape of
wastewater into the Harlem River. |
|
| Personnel |
Client
Contact |
|
|
William
Gassman
Larry Morton
Vincent J. Tomarch
|
|
| Completed
|
|
| 1991 |
|
Mr.
Fawzi Almahdi, Project Manager
Dormitory Authority State of New York
One Penn Plaza, 52nd Floor
New York, New York 10119
(718) 979-2058 |
|
| |
| |
|
Sagamore
Children's Psychiatric Center
Huntington, New York, FDC #7661 - HVAC, Corridor
Lighting, and Fire Alarm/Sprinkler |
|
| Project
involved the removal and replacement of an
existing wooden ceiling in an operating facility.
New lighting system, exit lighting and controls
were provided and the existing HVAC equipment
and systems were relocated. Phasing of the
rehabilitation work was required to minimize
the impact on residents. |
|
| Personnel |
Client
Contact |
|
|
William
Gassman
Frank Raphaelian
Esteban Cruz
|
|
| Cost |
|
| $2
Million |
|
| Completed
|
|
| 1993 |
|
Mr.
Fawzi Almahdi, Project Manager
Dormitory Authority State of New York
One Penn Plaza, 52nd Floor
New York, New York 10119
(718) 979-2058 |
|
| |
| |
|
Mid-Hudson
Psychiatric Center, FDC #53599
Visitors' Center Building 46, New Hampton,
NY
Prime Consultant - Arthur Minner, AIA |
|
| Chu
& Gassman provided the electrical, HVAC, plumbing
design and shop drawing review for this project.
Scope: Second Floor addition to Building 46
to house Personnel Office and Lockers. The
lower level lobby was also upgraded. |
|
| Personnel |
Client
Contact |
|
|
Jon
T. Chu
Mike Lin
Daniel Horner
|
|
| Cost |
|
| $500,000
(E / HVAC / P) |
|
| Completed
|
|
| 1994 |
|
Mr.
Fawzi Almahdi, Project Manager
Dormitory Authority State of New York
One Penn Plaza, 52nd Floor
New York, New York 10119
(718) 979-2058 |
|
| |
| |
|
South
Beach Psychiatric Center
Staten Island, New York
FDC #4850 - Utility Tunnels
Prime Consultant - Hazen and Sawyer, P.C.
|
|
| Chu
& Gassman provided the lighting and receptacle
system design for the utility tunnels under
two buildings. Emergency exit lighting was
provided together with lighting controls and
controllers to permit operation of the utility
tunnels in a safe manner. |
|
| Personnel |
Client
Contact |
|
|
William
Gassman
R. Keith Craven
|
|
| Cost |
|
| $800,000 |
|
| Completed
|
|
| 1990 |
|
Mr.
Fawzi Almahdi, Project Manager
Dormitory Authority State of New York
One Penn Plaza, 52nd Floor
New York, New York 10119
(718) 979-2058 |
|
| |
| |
|
South
Beach Psychiatric Center
Contract DA #58237
Lightning Protection/Surge Protection Systems
|
|
| Chu
& Gassman provided design and working drawings
and detailed specifications for construction
of lightning protection and surge protection
systems. Scope of work was in strict adherence
to DASNY Standards for Schematic Design, Design
Development, Construction Document, Bidding
and Award, and Construction Phases, including
detailed cost estimating in accordance with
the requirements set forth in the Design Cost
Control Manual. |
|
| Personnel |
Client
Contact |
|
|
William
Gassman
R. Keith Craven
Steven A. Martino
|
|
| Cost |
|
| $330,000 |
|
| Completed
|
|
| 1998 |
|
Mr.
Fawzi Almahdi, Project Manager
Dormitory Authority State of New York
One Penn Plaza, 52nd Floor
New York, New York 10119
(718) 979-2058 |
|
|
|
|
|