    Bowery Bay WPCP WP-237
Interim Plant Upgrading
Queens, New York

Subconsultant to Hazen and Sawyer, P.C.
Chu & Gassman has and continues to provide electrical design, construction sequencing, construction management, inspection and operational assistance services to Queens County, Bowery Bay Wastewater Treatment Facility, located in Queens, New York. The complete plant upgrade and renovation has involved multiple phases of construction with several contracts per phase over a period of 15 years.

The Bowery Bay project consisted of many phases of electrical, mechanical and instrumentation work including but not limited to, the following:

Replacement of entire HVAC systems for existing facilities and new system for Residuals Building and Service Building including design of 4-750 hp boilers, pumps, piping, and instrumentation system. HVAC system included replacement of 40 heating and ventilating units of total capacity of 750,000 cfm.

The electrical distribution system is to be extensively modified with the replacement of a 208 volt system with a modern 480 volt system. New 5kV switchboard and controls for the plant's main process air blowers (8 @ 1250 hp each) are to be provided. The main sewage pump controls will be modernized to utilize adjustable frequency drive (5 @ 800 hp).

Rehabilitation to the Con Edison service substation will be provided. Old air magnetic 5kV circuit breakers are to be replaced with modern vacuum breaker designs.

All electrical equipment will be monitored from a central control room. New air-conditioned control rooms will be provided to contain the plant's electrical equipment in order to minimize the corrosion attendant to the plant's proximity to the marine environment.
Personnel Client Contact

HVAC
Abraham Y. Ago
Dave Bhatia
Stanley Chan
Michael LaPilusa
Andrew Lu
Joseph S. Masucci
Electrical
William Gassman
Raghbir S. Bisal
Leonard W. Kurkewicz
Brian J. Martin

Cost
$212,000,000
$30,000,000 (HVAC)
$48,000,000 (E)
Completed
1998 (Design)
 
Mr. Jerry Lastihenos
Senior Vice President
Hazen and Sawyer, P.C.
498 Seventh Avenue, 11th Floor
New York, New York 10018
(212) 777-8400
 
    Hunts Point WPCP
New York, NY

City of New York Department of Environmental Protection
Elmhurst, NY

Subconsultant to URS Consultants

Chu & Gassman provided the electrical and HVAC Preliminary Design for a Contact Stabilization Program Study and Report completed in 1992.

Additional Facility Planning for Comprehensive Interim Upgrading (Task 10) included Final Report, Preliminary Design Report, Outline Specifications and was completed in 1997.

Construction Phase I includes, in general, all improvements required to meet SPDES permit or other regulations identified in the Final Summary Report as follows:

- Main Building Improvements
- Chlorination Building Improvements
- Central Heating Facility
- Interim Heating Facility
- Site Hot Water Distribution System
- Central Residuals Facility
- Primary Scum Pumping Stations
- Primary Sludge PS Improvements
- Effluent Water PS Improvements
- Main Building Personnel Addition
- Aeration Operating Gallery Improvements
- Aeration Buildings Improvements
- Piping Tunnels Improvements
- New Plant Power Distribution System consisting of three (3) 4160-480V unit
  substations, new ductbank system, 20 new motor control centers
- New Plant-Wide Instrumentation Control System

Construction Phase II will include in general all remaining improvements identified in the Final Summary Report.

- New Service Entrance Electrical Substation consisting of six (6) 13.2 k
 
feeders and six (6) 7.5 MVA transformers, new distribution switchgear with   synch bus and reactors.
- New emergency generator system consisting of six (6) 2-MW diesel engine
  generators.

Construction Phase III will include the Digester Gallery, Sludge Storage Tank Gallery and the Thickener Odor Control Building.

Construction Phases II and III are in progress.

Personnel Client Contact

Electrical
William Gassman
Frank Carnovale
R. Keith Craven
HVAC
Jon T. Chu
Abraham Y. Ago
Dave Bhatia
Mike LaPilusa
Joseph S. Masucci

Cost
$230,000,000
$75,000,000 (E/HVAC)
Completion
2006
 
Mr. Ernest Christbacher
URS Greiner
Mack Center II
Mack Center Drive
Paramus, NJ 07652-3095
(201) 262-7000
 
    Project WP-284
New York City Sludge Dewatering Facilities
Wards Island, Hunts Point, Jamaica, 26th Ward,
Oakwood Beach, Bowery Bay

City of New York
Department of Environmental Protection

Subconsultant to Hazen and Sawyer, P.C.
Chu & Gassman provided electrical engineers and inspectors to assist in construction management, electrical inspection and testing services for NYC DEP Sludge Dewatering Project Sites: Wards Island, Hunts Point, Jamaica, 26th Ward, Oakwood Beach, and Bowery Bay.

Engineers field tasks included: Cost estimates, negotiations, justification of design changes, issuance of change order requests, issue of field sketches, verification of payments to contractors, maintenance of documents, inspection indexes, and maintenance of record set of Contract Drawings.
Personnel Client Contact

Khondker Ahmed
Joseph Alonso
Jay Andrews
James Duffy
Daniel Karvelas
Edwin Lazovick
James Machuga
Juris F. Millers
Andreas Paphitis
Semyon Peltz
Daniel A. Puszka
Steven Rimoli

Cost
$246,000,000
Completed
1994
 
Mr. Jerry Lastihenos
Senior Vice President
Hazen and Sawyer, P.C.
498 Seventh Avenue, 11th Floor
New York, New York 10018
(212) 777-8400
 
    Red Hook WPCP WP-152
Contracts 8A and 12H
Manhattan, New York

City of New York
Department of Environmental Protection
Elmhurst, NY 11373

First Place Award - 1990
New York Association of Consulting Engineers

Subconsultant to Hazen and Sawyer, P.C.
The Red Hook Water Pollution Control Plant is designed to treat an average dry weather wastewater flow of 60 million gallons per day (mgd) and a peak wet weather flow of 120 mgd. It is a conventional, open-air facility, using step aeration for full Secondary Treatment and final disinfection to achieve an effluent quality consistent with regulatory standards (85% removal of pollutants).

Chu & Gassman provided electrical (including fire/smoke alarm systems) and HVAC design services for this project incorporating bio-gas fired co-generating facilities, a tri-fueled hot water generating plant. Modern computer controls were utilized throughout. We also provided start-up services for main pumps and blower and main substation equipment and control panels.
Personnel Client Contact

Jon T. Chu
William Gassman
Dave Bhatia
Frank Carnovale
Esteban Cruz
C. Derrick Markham
Construction
John M. Burt
Juris F. Millers

Cost
$157,000,000
$37,000,000 (Electrical, HVAC)
Completed
1990
 
Mr. Jerry Lastihenos
Senior Vice President
Hazen and Sawyer, P.C.
498 Seventh Avenue, 11th Floor
New York, New York 10018
(212) 777-8400